Food Pharma Machinery logo

Free planning tool

Pharma Project Cost Calculator

Estimate any pharma project — tablets, capsules, softgels, powders, liquids, ointments, vials, ampoules, lyophilized products, eye drops and IV fluids: machines, power load, utilities, building and cleanrooms, HVAC, water systems, QC lab, validation and GST. Choose your products and capacity; the estimate updates instantly.

1What will you make?

Oral solid dosage

10,00,000 tablets/day · e.g. 10 lakh tablets per day

Oral liquids & topicals

Sterile injectables & ophthalmics

2Automation level

3GMP standard

4Shifts, land & electricity

More shifts = fewer machines for the same output.

Industrial rate in your state; ₹8.5 is a typical average.

Estimated total project cost (incl. 18% GST)

₹9.25 Cr – ₹16.1 Cr

₹7.91 Cr – ₹13.8 Cr before GST · GST ₹1.34 Cr – ₹2.26 Cr (input tax credit may apply)

Machines

17

Built-up area

11,193 sq ft

Plot needed

~24,873 sq ft

Time to start

9–12 months

Where the money goes

  • Process & packing machinery36%₹2.88 Cr – ₹4.99 Cr
  • Building & cleanrooms25%₹2.15 Cr – ₹3.24 Cr
  • HVAC plant10%₹84 L – ₹1.39 Cr
  • Utilities & power10%₹79 L – ₹1.35 Cr
  • QC & micro labs6%₹45 L – ₹75 L
  • Installation, validation & pre-operative7%₹43 L – ₹1.07 Cr
  • Contingency (5–8%)6%₹38 L – ₹1.02 Cr

Machine list & cost

₹2.88 Cr – ₹4.99 Cr
MachineQtyPowerPrice eachTotal

Vibro sifter

36" sifter

12 kW₹2.5 L – ₹4.5 L₹2.5 L – ₹4.5 L

Rapid mixer granulator (RMG)

300 L RMG, PLC

130 kW₹18 L – ₹30 L₹18 L – ₹30 L

Fluid bed dryer (FBD)

120 kg FBD, PLC

130 kW₹16 L – ₹28 L₹16 L – ₹28 L

Multi mill / cone mill

Cone mill

16 kW₹3 L – ₹6 L₹3 L – ₹6 L

Blender

600 L bin blender

18 kW₹10 L – ₹18 L₹10 L – ₹18 L

Rotary tablet press

37-station double rotary · 1,30,000 tablets/hr

222 kW₹20 L – ₹35 L₹40 L – ₹70 L

Deduster + metal detector

Deduster + metal detector

23 kW₹3 L – ₹6 L₹6 L – ₹12 L

Tablet coating

48" auto coater · 1,50,000 tablets/hr

244 kW₹18 L – ₹30 L₹36 L – ₹60 L

Blister packing

Blister machine, 120 blisters/min · 72,000 tablets/hr

354 kW₹30 L – ₹50 L₹90 L – ₹1.5 Cr

Cartoning

Auto cartoner, 100 cartons/min

39 kW₹22 L – ₹40 L₹66 L – ₹1.2 Cr

Plant cost by segment

Each block's machines plus its share of the building (by floor area), HVAC (by air volume) and utilities (by power). QC lab, installation, validation, contingency, land and GST are shared in the same proportion, so the rows add up to the total.

SegmentMachinesBuildingHVACUtilitiesShared + GSTPlant cost

Tablets

10,00,000 tablets/day · ₹92–161 per tablet/day of capacity

₹2.88 Cr – ₹4.99 Cr₹2.15 Cr – ₹3.24 Cr₹84 L – ₹1.39 Cr₹79 L – ₹1.35 Cr₹2.59 Cr – ₹5.1 Cr₹9.25 Cr – ₹16.1 Cr
Whole project (incl. GST)₹9.25 Cr – ₹16.1 Cr

Utilities & power by segment

Electrical load, HVAC, steam, compressed air and water each product line needs, and what the whole plant needs.

Connected load

433 kW

Max demand 282 kW · 313 kVA

Transformer

400 kVA

sanctioned load to apply for

DG set (backup)

380 kVA

keeps HVAC & production running

Electricity per month

79,415 units

≈ ₹7.8 L bill @ ₹8.5/unit

HVAC

82 TR

air-conditioning tonnage

Steam

265 kg/hr

boiler capacity

Compressed air

183 CFM

oil-free

Water

23.1 KLD

PW 500 L/hr

Staff (approx.)

38

11 operators · 19 QA/QC

SegmentMachinesHVACSteamAirWaterUnits / month

Tablets

17 machines · 4,312 sq ft · 263 kW total

207 kW51 TR56 kW230 kg/hr173 CFM5 KLD50,294

water systems, compressors, boiler, QC lab, stores, offices, lighting

170 kW
Whole plant433 kWconnected82 TR265 kg/hr183 CFM23.1 KLD79,415

Whole-plant steam includes WFI and pure steam; air includes 20% for leaks; water includes staff use (1.7 KLD) and cooling tower make-up (16.4 KLD). HVAC runs 24 hours; machines run 1 shift a day, 26 days a month.

How this estimate works

  • Indicative 2026 Indian prices for new GMP-grade equipment and construction. Actual quotes depend on make, specifications, location and timing.
  • Machine numbers assume 8-hour shifts at about 70% of rated speed; tablet capacity assumes a 300 mg average tablet.
  • Power, HVAC, steam, air and water are planning estimates to size the transformer, DG set, boiler and water systems; your consultant will finalise them.
  • Not included: land (unless entered), working capital, raw materials, salaries and product registration fees.
  • Nothing you enter here is sent to us. Use "Get exact quotation" or WhatsApp for a detailed project report.